This week, the Biotrade teams finalised the installation of a travelling bridge with a complete floating matter recovery system on a site in Brittany.
Installation features
Double scraper system to optimise the scraping surface across the tank
On-board control cabinet for autonomous and automated operation
100% French manufacturing
Installation carried out directly on site by our teams
A turnkey project
From design to installation, Biotrade managed the entire project. Commissioning is scheduled for early 2026.
Thank you to all the teams involved: sales, design office, workshop and site teams.
Do you have a settling or floating matter treatment project? Contact us to discuss it.

