A major project in our workshop

Categories:

Biotrade is currently finalising the manufacture of two suction clarifier bridges with exceptional dimensions. This project brings together the full scope of our industrial expertise.

The project in figures

2 diametral bridges, each 42 metres long

Over 15 tonnes of steel and technology per unit

100% designed and manufactured in-house, from engineering to delivery

Meticulous preparation

Behind these tonnes of steel, every detail has been carefully anticipated: sizing studies, calculation notes, electrical and safety testing, as well as a complete trial assembly in our workshop.

Teamwork at every stage

This challenge could not have been achieved without full cooperation between all our teams: sales, design office, electrical and automation, workshop, purchasing and logistics.

This project once again demonstrates Biotrade’s ability to adapt to the most specific requirements.

Do you have a similar project? Contact our team to discuss it.